AEG provided environmental, health and safety support during gas storage and distribution facility abatement, dismantling and demolition activities. The project site was located in an area with residences surrounding the facility. This project was completed in two months without incident. AEG prepared technical specifications for asbestos/lead-based paint abatement activities and, health and safety plan (HASP) which addressed anticipated health and safety risks. AEG’s staff of industrial hygienists/third party monitors under the direct supervision of the Board Certified Industrial Hygienist, observed that required work practices and appropriate engineering controls were implemented. AEG established airborne contaminant action levels which triggered adjustments to work practices and or mitigation measures. AEG prepared a draft community health and safety plan (CHASP) which included micro scale meteorological data collection, upwind and downwind perimeter fenceline and neighborhood air monitoring to protect the public. Several buildings, boilers, gas piping, fin fans and tanks were abated and demolished. No odor, dust or noise complaints were noted. No significant accidents, incidents or injuries were observed.